Schematic Design and Development

We prepare preliminary measurement and cost plans from the original schematic design documents to establish a limit of probable costs.

These cost estimates are progressively updated in line with revised design information. We can provide advice on design changes, and give an opinion on realistic Tender dates.

We attend project meetings and advise on alternative materials and methods of construction to maintain budget control and project timing.

We incorporate engineering consultants’ services cost estimates in to the total project construction cost to confirm they remain within the overall budgeted allowances previously included.

We advise on supply and demand status of both labour and materials within the building industry, which may directly or indirectly affect future project costs and timing.

We can prepare cashflow charts when they are required, and advise on the types of contracts to be used.